LATEST NEWS
SELECTED FOR YOU

Keel shuts all US bitcoin mines, sells 1,085 BTC in AI pivot

ByRanda MosesRanda Moses 2 mins read
Keel shuts all US bitcoin mines, sells 1,085 BTC in AI pivot.
  • Keel Infrastructure shut every US bitcoin mine and sold 1,085 BTC for $75 million between April 1 and August 7.
  • The company posted $30 million in second-quarter revenue, down 50% year over year.
  • Listed miners have now sold more than 15,000 BTC and announced more than $70 billion in AI and HPC contracts.

Keel Infrastructure, formerly known as Bitfarms, powered down all of its US bitcoin mining sites and sold 1,085 BTC for $75 million.

The company disclosed both in Monday’s second-quarter earnings as it retools the properties into data centers for artificial intelligence.

Bitfarms becomes Keel and the bitcoin pile shrinks

According to its August 10 results, Keel said it finished decommissioning its US mining fleet to make way for high-performance computing construction.

The 1,085 BTC sold between April 1 and August 7 were sold for $75 million. That leaves 1,861 BTC on the balance sheet worth ~$121 million in unencumbered coins as of August 7.

Keel took over Bitfarms in April and rebranded shortly after. It trades on the Nasdaq and the TSX under KEEL. The company calls itself a North American digital infrastructure and energy company with a 2.2-gigawatt development pipeline across Pennsylvania, Washington State, and Québec.

Keel reported $30 million in revenue from its continuing legacy operations. This figure is half of what it recorded a year ago, attributed to a weaker bitcoin price and the closure of its Moses Lake mining facility in April.

For the second quarter of 2025, Keel’s ongoing business had $11 million of operating income, but this year reported a $141 million operating loss. That figure included $84 million in non-cash depreciation.

Loss from continuing operations was $64 million, or 11 cents per share, and adjusted EBITDA was negative $24 million. General and administrative expenses increased to $31 million from $19 million in the prior year, which the company attributed to hiring senior staff for its build-out. Shares of KEEL fell over 11% on Monday.

“Power is the constraint. Everything else is downstream of it,” said CEO Ben Gagnon in the earnings statement.

He stated that Keel set up around that idea 18 months ago and now has all three priority sites near full permitting with tenants in negotiations on each.

The company is “negotiating from a position of strength,” Gagnon said, citing $819 million of liquidity and uncommitted 2027 capacity across the PJM grid and Washington.

Keel joins a sector-wide exodus from mining

CFO Jonathan Mir said Keel is “better capitalized today than at any point in our Company’s history.”

That liquidity figure includes about $698 million in unrestricted cash and $121 million in bitcoin, boosted by a $458 million convertible note offering raised during the quarter.

Keel also disclosed that it secured zoning approvals at its Panther Creek and Sharon sites, appointed Ganesh Aiyer as its president, received its first Vertiv modules at Moses Lake, and agreed to take over 96 MW of capacity for a data center in Sherbrooke, Québec.

Public miners have sold over 15,000 BTC since their treasuries peaked, as earlier reported by Cryptopolitan. The weighted-average cash cost to mine a single bitcoin was about $79,995 in the fourth quarter of 2025, with the price ranging between $68,000 and $70,000. Miners were losing around $19,000 on each coin mined.

More than $70 billion in AI and HPC contracts have been announced across the listed mining sector. Bitdeer reduced its holdings to zero in February. Empery Digital sold 1,400 BTC in July. MARA Holdings, IREN, Cipher Digital, and DMG Blockchain have all moved to repurpose power capacity or hardware for AI customers.

MARA has agreed to buy a 505 MW gas plant in Ohio for $1.5 billion, and IREN has signed a five-year, $3.4 billion cloud deal with Nvidia for Blackwell GPUs.

Don’t just read crypto news. Understand it. Subscribe to our newsletter. It's free.

FAQs

How much bitcoin did Keel sell and how much does it still hold?

Keel sold 1,085 BTC for $75 million between April 1 and August 7, 2026, and had 1,861 BTC left on its balance sheet, according to its Q2 of 2026 results.

Why is Keel closing its US bitcoin mining operations?

Keel decommissioned its US mining sites to prepare them for AI and high-performance computing data centers.

How did Keel's stock and finances perform in the second quarter of 2026?

Keel posted $30 million in revenue, down 50% year over year, and a $141 million operating loss, and its shares fell more than 11% on Monday, August 10, 2026.

Share this article

Disclaimer. The information provided is not trading advice. Cryptopolitan.com holds no liability for any investments made based on the information provided on this page. We strongly recommend independent research and/or consultation with a qualified professional before making any investment decisions.

Randa Moses

Randa Moses

Randa Moses is an editor and reporter at Cryptopolitan covering tech, AI, robotics, crypto, scams, and hacks. She has worked in the crypto space since 2017. She held roles at Forward Protocol, AmaZix, and Cryptosomniac. Randa holds a degree in Electrical and Electronics Engineering from the University of Bradford.

MORE … NEWS