Portugal makes AI push in move to swap tourists for data centers

- Portugal is investing billions to turn Sines into a digital and logistics hub.
- New projects include a $9.9 billion data center and a $2.3 billion battery factory.
- Locals fear that the tech investments will cause more strain on their infrastructure rather than benefit them.
Portugal intends to diversify its economy with tech rather than relying on seasonal tourism. A $9.9 billion data center called Start Campus is already in the works in the coastal city of Sines to that effect.
Portugal’s economy has always leaned heavily on tourism. The country is an affordable tourist destination with a diverse culture and history, along with breathtaking landscapes that attract millions each year. But in Sines, a port city in Southwestern Portugal, the government is investing billions into replacing the port and power plant the city is known for with servers.Â
Portugal’s entry into the tech industryÂ
The Sines coast has a web of undersea cables connecting Europe to Brazil, Africa, and soon, South Carolina through a new Google link. These connections make Sines a prime location for data traffic across these continents, and Portugal intends to use that advantage to build an economy that’s less vulnerable to seasonal tourism.
A notable example of Portugal’s entry into the tech industry is Start Campus, a €8.5 billion ($9.9 billion) data center that could become one of the largest in Europe. It opened its first building in March and will host cloud and computing services for clients across the continent.Â
Tech giants Nvidia and Microsoft have reportedly agreed to lease space in the facility. By 2030, the site is expected to include six buildings, all running entirely on renewable energy. Also by 2030, according to the Portuguese business outlet ECO News, the total investment tied to Start Campus and its partner infrastructure could reach €30 billion when customers’ own equipment and server builds are included.Â
The data center is located next to an old power plant that represents Portugal’s failed attempt in the 1970s to make Sines an industrial hub. Residents of the city remember the surge of workers who arrived in the 70s to build the port and refinery.Â
Unfortunately, after the 1974 revolution, Portugal lost its colonies, and many of those industrial plans collapsed. The refinery from that time is still running today, but the power plant shut down in 2021 when renewable energy became cheaper.Â
Now, parts of that old infrastructure, like its cooling systems and seawater pipes, are being reused to support the new data center.
The developers behind Start Campus say the full site will reach 1.2 gigawatts of power capacity, which is roughly what the city of Lisbon consumes. The facility will also run entirely on renewable energy.Â
Locals have reasons to be skeptical of the government’s plans
Residents of Sines remember when a surge of workers arrived to build the port and refinery in the 1970s. However, the economy stalled soon after, and many of those newcomers eventually left, taking their earnings with them.
This time, Portugal’s government estimates that projects in the area, including the data center, a €2 billion battery factory by China’s CALB Group, and a port expansion, add up to investments that are equal to 4.6% of national GDP and could create more than 5,000 jobs.
According to Bloomberg, the Minister of Economy, Manuel Castro Almeida, referred to Sines as “the heart of the transformation of the Portuguese economy.”
To attract foreign investment, the government has offered incentives such as up to €350 million in funding for CALB’s battery plant. Once completed in 2028, it is expected to produce batteries for more than 200,000 electric vehicles each year and employ 1,800 people.Â
The Port of Singapore Authority is doubling the capacity of the deepwater terminal to strengthen Portugal’s position as a logistics hub between Europe and the Atlantic.
Still, residents are worried that the promised growth will only cause strain for locals. Housing shortages in the city are already severe.
Transportation is another problem, as plans for a new highway and rail links to Spain are already years behind schedule. Freight trains remain slow, and there is still no passenger rail service to Sines. Pedro do Ă“ Ramos, head of the Port Authority, told Bloomberg that the lack of modern infrastructure limits the port’s potential.Â
“I was told for years there wasn’t enough traffic to justify a highway,” he says. “But today there’s already too much.”
The smartest crypto minds already read our newsletter. Want in? Join them.
Disclaimer. The information provided is not trading advice. Cryptopolitan.com holds no liability for any investments made based on the information provided on this page. We strongly recommend independent research and/or consultation with a qualified professional before making any investment decisions.
CRASH COURSE
- Which cryptocurrencies can make you money
- How to boost your security with a wallet (and which ones are actually worth using)
- Little-known investment strategies that the pros use
- How to get started investing in crypto (which exchanges to use, the best crypto to buy etc)















